現場監工日誌 On-site supervising report
本日進場工種及工作摘要 / Workers & Job Summary
水電 5 人: 電線佈設。
5 Electrician: Laying electrical wires and cables.
輕隔間 5 人: 第二面封板作業。
5 Light Steel Frame Workers: Put up second side of gypsum dry board on partition walls.
油漆 2 人: 木製門框批土,部分隔間牆面接縫處上AB膠。
2 Painters: Wooden door frame and partition walls plastering work.
木工 4 人: 門片定位。
4 Carpenters: Doors positioning.
空調 6 人:室內機吊掛,冰水管佈設。
6 A/C Technicians: Indoor A/C fan unit positioning; cool water chiller pipes installation.
現場施工細節照片 / Photos
Door installed (Avocent Office-11) |
New A/C Ventilation duct installation |
Sliding door installed (Avocent HW) |
Second side of gypsum dry board installed (Avocent Medium Lab) |