本日進場工種及工作摘要 / Workers & Job Summary
輕隔間 3 人: 部分隔間及封板修改補強。
2 Light Steel Frame Workers: Modifications on some partition walls.
油漆 2 人: 木製門框批土。
2 Painters: Wooden door frame plastering work.
空調 6 人:冰水管移除及佈設,電路管線配管。
6 A/C Technicians: Old chiller pipes removal and new chiller pipes installation; electrical and control wirings pipes positioning.
現場施工細節照片 / Photos
A/C cool water chiller pipes installation |
A/C chiller pipes entering I.T Room |
A/C cool water chiller pipes installation (Avocent) |